China factory frog type lithium ion 24v 10ah lithium battery for electric bike
Type |
24v 10Ah lithium frog battery |
1. Basic Spec |
Weight |
<=3.7kg |
Demension(T*W*H) |
250*150*140(mm) |
Working temperature |
Charge temperature |
0-45 degree |
Discharge temperature |
-20-65 degree |
Retention of charge(store in one month) |
>=95% |
2. Technical parametal |
Voltage |
24v |
Capacity |
10Ah |
Charge |
Charge method |
CC/CV |
Charge current |
2A |
Max charge current |
5A |
Cut off voltage |
43.8v |
Discharge |
Standard discharge current |
10A |
Max discharge current |
3c |
Discharge cut off voltage |
28.8v |
Cycle life |
1000 times |
3. Safety protection |
Short circuit protection |
No fire, No explosion |
Overcharge protection |
Crush safety protection |
Needling protection |
Extrusion protection |
130 degree high temperature protection |
About Eastar Battery
Shenzhen Eastar Battery Co., Ltd was set up as a manufacturer of various batteries in 1997.Our main products include dry batteries ( carbon & alkaline), lead-acid batteries(General batteries, Auto batteries), Ni-MH/Ni-CD batteries and packs, Lithium batteries ( Li-ion, Li-PO).
Quality is our life
As a battery manufacturing group, we have separate factory located in Guangzhou, Shenzhen and Xingfeng for different battery types.We invested much on the advanced production facilities and testing equipments.We have a powerful R&D and skillful worker group.Based on ISO9001, we built up a complete quality control system.
The best services to you
1 year Warranty
ODM & OEM service
24 hours online service
Payment & Shipping
Exhibition
FAQ
1.Q:Can you accept OEM and ODM Service?
A:Yes, we supply OEM&ODM service as clients requirement.
2.Q:Can we get samples for test?
A:Yes, we offer sample, but free samples are not available at beginning.
3.Q:What's your payment term?
A:TT, L/C, West Union, Paypal etc.
4.Q:What's your warranty for products?
A:Generally speaking, it's one year's warranty, for quality problems, we will send you a new one.
5.Q:How long will be the delivery?
A:Usually delivery in 7-15 days, but could be change according to the quantity or other things.
6.Q:How do you control your product quality.
A:All batteries have 10 steps testing during the whole production.